Thanks to the efforts of ELENG LLC the damaged vessel KMAX RULER was loaded in one of the ports of Great Odesa in the shortest possible time. Structural damage and radio navigation equipment was repaired, the hydraulics of the hold covers also were repaired.
The ship left on its own with the cargo through the temporary corridor in the direction of the Bosphorus.
